Engineering Standard Details
SJWD Standard Details - Complete SetGeneral Water NotesSheet No. 1 - Fire HydrantsSheet No. 2 - Cut-Slope Fire HydrantSheet No. 3 - Fill-Slope Fire HydrantSheet No. 4 - 1" thru 2" Residential Fire Service Installation
Sheet No. 5 - Not used
Sheet No. 6 - 1" thru 2" Single Service Lateral AssemblySheet No. 7 - Distribution Main Service Connections 1" thru 2"Sheet No. 8 - Main Valve AssemblySheet No. 9 - 4" and 6" Blow Off AssemblySheet No. 10 - 1" and 2" Air Vacuum Release ValveSheet No. 11 - Pipe Line Trench SectionsSheet No. 12 - Thrust Blocks InstallationSheet No. 13 - Thrust Blocks InstallationSheet No. 14 - Locating Wire for Non-Metallic PipeSheet No. 15 - Valve Operating Shaft ExtensionSheet No. 16 - Guide and Location MarkersSheet No. 17 - Water and Sewer Line SeparationsSheet No. 18 - Standard Meter Connection 1"Sheet No. 19 - Standard Meter Connection 1.5" - 2"Sheet No. 20 - Standard Meter Connection 3" and LargerSheet No. 21 - 1" and 2" Reduced Pressure Backflow Preventer InstallationSheet No. 22 - Backflow Prevention Device with Meter_2.5" or LargerSheet No. 23 - Backflow Prevention Device with Fire Dept ConnectionSheet No. 24 - Water Meter Touchread Device Installation InstructionsSheet No. 25 - Backflow Prevention Device without Fire Dept ConnectionSheet No. 26 - Typical Utility Service Box Configurations in SubdivisionsSheet No. 27 - Sampling Station Installation